Directions:
Please read directions fully before proceeding so that you understand the complete POR-15 2K Urethane Part A and POR-15 2k Urethane Hardener Activator process. Surface must be clean, dry, and in sound condition. Remove all oil, dust, grease, dirt, loose rust, and other foreign material to ensure adequate adhesion.
For all metal surfaces: Remove all oil and grease from surface with POR-15 Cleaner Degreaser following directions on container. Prepare the surface to be coated using POR-15 Metal Prep. For better performance, use Near White Metal Blast Cleaning per SSPC- SP10/NACE 2. For optimum performance prime any bare metal with POR-15 Rust Preventive Coating.
APPLICATION:
Mix contents of each component thoroughly with low speed power agitation prior to combining 2K Urethane Part A with Part B 2k Urethane Hardener Activator. Make certain no pigment remains on the bottom of the can. After each component is fully mixed, combine 3 parts by volume of 2K Urethane Part A with 1 part by volume of Part B 2k Urethane Hardener Activator. Thoroughly agitate the mixture with power agitation for 5 minutes (DO NOT SHAKE). Apply with natural bristle brush or spray (Read all warnings and use adequate safety equipment when spraying).
POT LIFE: 2 hours.
DRY TIME: 12 hours.
RE-COAT TIME: 6 hours.
CLEAN-UP: Use xylene to thin (max. 10%) and to clean application tools or non-cured drips and splatter.
Use only with adequate ventilation. Before opening cans (POR-15 2K Urethane Part A and POR-15 Part B Urethane Hardener Activator) please read all warnings labels and use adequate safety equipment.